Projects - Planned

***Disclaimer - All Projects Subject to Change based on available funds and/or Selectman Approval***

Paving (2019)

• Moses Hill Road

• Rockwood Heights

Paving (2020)

• Walker Road

• Washington/Sea/Summer (intersection only)

• Central/School/Union (intersection only)

• Beach/Union (intersection only)

• Beach Street Sidewalk (Masco to Singing Beach)

Water Main (with final paving in 2020)

• Ocean Street

• Victoria Road

• Magnolia Road

• Raymond Street

• Boardman Ave

. Butler Ave

Sewer

• Harbor Loop Sewer Lining

Culvert Replacement scheduled for 2020

• Central at Elm

Singing Beach Revetment Repair (2020)